CCABA
HVAC - Ventilation - Piping
Charlotte, North Carolina
Complete installation of York high efficiency heat pumps with variable speed air handler units mounted above the ceiling.
All condensers were installed on the roof including the outdoor air temperature ventilation system and exhaust fans.
Installed all ductwork and controls.
Project Status:
Compete
Project Delivery Method:
Design-Build
Project duration, design & construction:
4 Months – Construction
Project construction cost:
$260,000
Project Size:
9000 sq ft
Project Contact:
Andrew Rowe
DCG Construction, LLC
704-351-7208
arowe@dcg-construction.com
Project Area Categories:
Medical Clinic Commercial
Project Services Categories:
– HVAC
– Ventilation
– Piping
See what our customers say about us.
Contact Alma HVAC today and experience the exceptional expertise, knowledge, and dedication we bring to the field of heating, ventilation, and air conditioning.
Taking care of your business environment with excellence.
© 2023 Alma HVAC. All rights reserved.
Designed by Rodrigo Gomes Brito | Powered by Facilitator One